Skip to content
Pipes laid beside an open trench, with an excavator.

Etago-Mogenda water reticulation system

Construction of the Etago-Mogenda water reticulation system: 10 km of HDPE pipeline, a reinforced concrete tank, three 150 m3 elevated steel tanks, an RC inlet weir and a treatment unit. Built December 2022 to November 2023.

Ruthasha worked on this project as a subcontractor.

PlaceKisii County

Year
2023
Category
Water
The work
10 km of HDPE pipeline and three 150 m³ tanks